Project name

Pilot introduction of smart safety equipment for port construction

Supervising organization

The Ministry of Oceans and Fisheries

Project period

March 30, 2022 to November 19, 2023 (in progress)

Background and Necessity

  • The purpose is to investigate and analyze the current status of smart construction safety technology development in the host organization.
  • The purpose is to analyze smart safety technology and equipment applicable to each type of port construction through the introduced smart safety equipment.For the above purpose, smart safety equipment is introduced by piloting and applying it to port construction sites.
  • Afterward, through verification, the equipment that is easy to use in port construction sites will be expanded and standard guidelines will be prepared.

Function

  • Worker management for each site work section, worker SOS function, notification of access control for workers and heavy equipment operators using IoT sensors, mobile CCTV that can be used according to site changes, and status management for each worker using smart bands.

Project description

Project description: Investigation and analysis of the current status of smart construction safety technology development

Expected benefits

  • Preventing accidents such as entrapment, collision, and crushing of workers near heavy equipment
  • Identifying high-risk workers
  • Preventing fall accidents while working at height (Smart Airbag)

Introduction type

RISKZERO—site (risk assessment not included) / mobile CCTV / linked with heavy equipment access control / worker equipment

System configuration

Key introduction cases

Kolon Global
Kolon Global risk factor monitoring system
2021.08 ~ 2022.2
Gyeonggi Housing & Urban Development Corporation
smart safety management integrated control system
Ulsan Port Authority
UPA-type construction work risk factor monitoring system
September 11, 2020 ~ December 31, 2020 / Currently in operation
Korea Gas Corporation
Dangjin base LNG tank construction (installation of smart Integrated safety management facilities)
March 30, 2022 to December 31, 2025 (in progress)
The Ministry of Oceans and Fisheries, Ulsan Regional Office of Oceans and Fishers
Ulsan southern breakwater 2-3 section construction work RISKZERO system
July 2022 to September 2025 (in progress)
The Ministry of Oceans and Fisheries
Pilot introduction of smart safety equipment for port construction
March 30, 2022 to November 19, 2023 (in progress)